Sellwood

Floor: 
1st, DoubleTree Hotel
Capacity: 
82
Part of: 
Willamette Ballroom
Comment: 

Activities in this Room:

Date Time Slot Activity Changes
Sunday, Aug 23 2:30 PM to 3:30 PM C141 Basics of signaling and automating your layout
Sunday, Aug 23 4:00 PM to 5:00 PM C142 Behind the scene at Miniatur Wunderland
Monday, Aug 24 8:00 AM to 9:00 AM C240 This is your first NMRA national convention
Monday, Aug 24 9:30 AM to 10:30 AM C241 Iron and Steel: the industry
Monday, Aug 24 11:00 AM to 12:00 PM C242 The European N scale convention
Monday, Aug 24 1:00 PM to 2:00 PM C243 Beyond Pratt: Designing and building better bridges for your layout
Monday, Aug 24 2:30 PM to 3:30 PM C244 Building a layout in a hostile environment
Monday, Aug 24 4:00 PM to 5:00 PM C245 Thinking outside the box: Designing the B&O Chicago Terminal RR
Monday, Aug 24 7:00 PM to 8:00 PM C246 Train Dispatching Elements
Monday, Aug 24 8:30 PM to 9:30 PM C247 Designing and building the T&NO in East Texas
Monday, Aug 24 10:00 PM to 11:00 PM C248 Buildings on the Southern Pacific Cascade line, Eugene to Crescent Lake
Tuesday, Aug 25 8:00 AM to 9:00 AM C340 Passenger terminals and servicing facilities: Prototype examples
Tuesday, Aug 25 9:30 AM to 10:30 AM C341 JMRI overview and current status
Tuesday, Aug 25 11:00 AM to 12:00 PM C342 CATS: A CTC panel that grows
Tuesday, Aug 25 1:00 PM to 2:00 PM C343 JMRI DecoderPro: A conceptual overview
Tuesday, Aug 25 2:30 PM to 3:30 PM C344 Achievable Realism
Tuesday, Aug 25 4:00 PM to 5:00 PM C345 Layout design with a passenger train emphasis
Tuesday, Aug 25 7:00 PM to 8:00 PM C346 Add perspective to your modeling
Tuesday, Aug 25 8:30 PM to 9:30 PM C347 You thought prototype research might be fun
Tuesday, Aug 25 10:00 PM to 11:00 PM C348 Highball to Indy, 2016! New
Wednesday, Aug 26 8:00 AM to 9:00 AM C440 The Willamette locomotive
Wednesday, Aug 26 9:30 AM to 10:30 AM C441 Hazardous material markings on rail cars
Wednesday, Aug 26 11:00 AM to 12:00 PM C442 Big railroads in small spaces
Wednesday, Aug 26 1:00 PM to 2:00 PM C443 Signaling your layout with DCC for control/operations
Wednesday, Aug 26 2:30 PM to 3:30 PM C444 Introducing NMRA LCC - NMRA Layout Command Control
Wednesday, Aug 26 4:00 PM to 5:00 PM C445 OpenLCB/NMRA LCC - Overview and Current Status
Wednesday, Aug 26 7:00 PM to 8:00 PM C446 OpenLCB User's Group Meeting
Wednesday, Aug 26 8:30 PM to 11:00 PM C447 NMRA LCC (Layout Command Control) from the user's perspective
Thursday, Aug 27 8:00 AM to 9:00 AM C540 The Spruce Production Division
Thursday, Aug 27 9:30 AM to 10:30 AM C541 Manufacturing - how, what, when, where, and why
Thursday, Aug 27 11:00 AM to 12:00 PM C542 Phones for Ops - updated!
Thursday, Aug 27 1:00 PM to 3:30 PM C543 Operations 201 - Preparing to host operations
Thursday, Aug 27 4:00 PM to 5:00 PM C544 The Willamette locomotive
Thursday, Aug 27 7:00 PM to 8:00 PM C545 Meet the Prez - the president of the NMRA that is...
Thursday, Aug 27 8:30 PM to 9:30 PM C546 Annual NMRA business meeting
Thursday, Aug 27 10:00 PM to 11:00 PM C547 Operations 101 - becoming an operator
Friday, Aug 28 1:00 PM to 2:00 PM C641 Scratchbuilding an animated coal mine
Friday, Aug 28 2:30 PM to 3:30 PM C642 The Northwestern Pacific - Challenges and rewards of modeling a prototype railroad
Friday, Aug 28 4:00 PM to 5:00 PM C643 Now it can be told, the "secret" layout in the Land Down Under
Friday, Aug 28 7:00 PM to 8:00 PM C644 Basic electronics for model railroads
Friday, Aug 28 8:30 PM to 9:30 PM C645 Layout design for signaling
Friday, Aug 28 10:00 PM to 11:00 PM C646 Operations with Virtual railroading
Saturday, Aug 29 8:00 AM to 9:00 AM C740 Designing and building laser-cut freight cars
Saturday, Aug 29 9:30 AM to 10:30 AM C741 An update on my 1892 Housatonic Railroad layout
Saturday, Aug 29 11:00 AM to 12:00 PM C742 EduTRAIN update
Saturday, Aug 29 1:00 PM to 3:30 PM C743 What's in my toolbox